H.H.Engineers

Specialized in earthwork, all types of bridges, tunnels, laying of tracks, building work and EPC contracts

 
 
  • EQUIPMENT
  • FEEDBACK
  • COMPLETED WORK
  • CURRENT PROJECT

 

Equipment

Sr.
No.

Description of
Machinery / Equipment

Size Capacity/HP
whichever
is applicable

Make/Model

Year of Purchase

Total No.of machinery/
Equipment available
with the tenderer

01

Excavators

1cum bucket

L&T CK72/90

2008

2

02

Loaders

1cum bucket

Escorts JCB 3D

2001

2

03

Miniloader

0.4cum bucket

IR-Bobcat

2002

1

04

Air Compressors

600 CFM

Atlas Copco

1998

2

05

Air Compressors

375 CFM

IR

1992

1

06

Air Compressors

250 CFM

Atlas Copco

1993

1

07

Jack Hammers

40mm Drill

RH-656-4W Atlas Copco

1994-1998

20

08

Air Circulator fans with ducts

25HP

ROOTS

2002

2

09

Water Pumps

5HP

Kirloskar

1999

4

10

Water Pumps
(Pneumatic)

10HP

RHEPL

2002

1

11

Wagon Drill

100 mm-150mm

 

1989

1

12

Generators

20KVA

Powerman

2000

3

13

Generators

125KVA

Cummins

2009

2

14

Tippers

10T

Ashok Leyland & TATA

1990-2000

32

15

Mini Batching Plant

12 cum/Hr

Universal

2004

1

16

Transit Mixer

6 cum

TATA

2009

4

17

Concrete Pump

20 cum/Hr

Schwing

2004

1

18

Bar Cutting & Bending Machine

32 mm Bar

Orient

2004

2 each

19

Structural Steel
Bending Machine

300 mm ISMC

Fabricated

1999

2

20

Batching Plant

20 cum/Hr

Deccan

2009

2

21

Slip form Shutter

Various Dia

Canstro

2008

3

22

Crusher

100/Tan/Hr

Singh, Nashik

2010

1

 

Feedback

 

Complete Work

Sr.No.

Name of The Work Completed

Client

Value(in Lakhs)

Date of Completion

1.

Construction of Tunnel No. RN-6,7,8 in Ratnagiri (N)

Konkan Railway

326.610

12.08.1996

2.

Construction of Tunnel No. RN-3 in Ratnagiri (N)

Konkan Railway

150.810

26.12.1995

3.

Earthwork in approach cut Tunnel No.RN-2

Konkan Railway

11.790

20.06.1995

4.

Construction of box type ROB / RUB

Konkan Railway

56.560

20.04.1995

5.

Embankment behind abutment of Kondivali Bridge

Konkan Railway

4.810

29.07.1995

6.

Linking of Track between km 114.5 - 129.2

Konkan Railway

159.730

24.05.1997

7.

Construction of approach road ROB

Konkan Railway

4.570

10.08.1995

8.

Construction of 2 Box type bridges at Kamthe

Konkan Railway

32.620

25.07.1995

9.

Construction of R.C.C.pipe culvert at Kandivali

Konkan Railway

10.000

02.08.1995

10.

Linking of Track between 129.2 - 131.03, 148.113 - 149.243 & 152.227 - 153.059

Konkan Railway

38.910

23.12.1996

11.

Construction of tunnel no. GT - 3 GB in Goa Zone

Konkan Railway

147.680

10.06.1997

12.

Construction of tunnel no. GT - 3A in Goa Zone

Konkan Railway

56.590

09.06.1997

13.

Provision of lining & shotcreting Inside Barcem Tunnel

Konkan Railway

56.590

09.06.1997

14.

Linking of Track in Margao, Goa

Konkan Railway

30.410

27.09.1997

15.

Linking of Track in Tivim, Goa

Konkan Railway

8.790

23.07.1997

16.

Shotcreting & Rock bolting inside Asurde tunnel in Ratnagiri

Konkan Railway

56.210

27.07.1998

17.

Construction of Kamshet II Tunnel

MSRDC

1203.560

08.04.2000

18.

Construction of Khandala Tunnel

MSRDC

691.650

27.09.1997 

19.

Ownership scheme at Daund

Ownership

50.000

 

20.

Construction of Sub Station at Khandala Mumbai MPEW

Konkan Railway

39.960

27.02.2002

21.

Stabilization of Slope at Ch.:105/25 - 26 between Karjat & Lonavla in SE Ghat.

Central Railway

27.840

01.11.2001

22.

Precast R.C.C.box 2 x 2 at distressed bridge at km 163/2 on PALNL section

Central Railway

9.950

01.10.2002

23.

Prop Interning of Arch and jacketing of abutments piers for various bridges in PA-LNL section

Central Railway

54.670

14.10.2003

24.

Providing R.C.C.box segment between PA-LNL section

Central Railway

46.990

14.10.2003

25.

Replacement of existing Girder stm slab of various bridge between PA-LNL & PA HDP section

Central Railway

33.590

14.10.2003

26.

Construction of Hydro Tunnel for Tata Power at Khopoli

Konkan Railway

164.000

22.05.2003

27.

Rehabilitation of bridge no.238/1, 239 on PA - Wadi Section

Central Railway

37.000

22.05.2003

28.

Rehabilitation of bridge no.238/3, 251/1 on PA - Wadi Section

Central Railway

40.000

25.03.2004 

29.

Construction of two way bridge near TATA Dam at Lonavla

Sahara India
Commercial Com. Ltd

222.300

15.05.2004

30.

Construction of road crossing for various facilities

Sahara India
Commercial Com. Ltd

16.530

25.06.2003

31.

Rehabilitation of Arch bridges between Pune-Lonavla Section for various bridge

Central Railway

92.820

09.06.2004

32.

Construction of test track for Skybus Metro at Madgaon, Gao

Konkan Railway

245.710

31.07.2004

33.

Construction of Substructure of 19 x 18.30m span Viaduct Bridge between Ch:11449.20 M to Ch:11835.40M and earthwork in approaches in Pangri Usmanabad Section in connectuin with Latur-Kurduwadi Gauge Conversion Project.

Central Railway

656.907

30.05.2008

34.

Rehabilitation BR.No.56/6 @ km.56/13-14(SE) by 3.wx2.00m RCC Box Pushing Technique & Rehabilitation BR.No.66/4@km.66/8-9(SE) by 3mX2m RCC Pushing Technique on KYN-Karjat Section

Central Railway

57.904

24.02.2010

35.

Protection arrangement inside tunnel no.2 by providing steel portals at km 91/13-17, 92/5-6, 92/8-9 and 91/17-22 on PNVL-KJT section under ADEN (N)LNL

Central Railway

321.672

27.05.2010

36.

Construction of Balance Minor Bridge in Pandhapur - Miraj Section in connection with Miraj - Latur Gauge Conversion Project

Central Railway

684.449

20.06.2010

37.

Risk & Cost Works for Construction of Minor Bridges in Pandharpur - Miraj Section in Connection with Gauge Conversion of Latur- Miraj.

Central Railway

1975.413

30.11.2010

 

Work In Hand

Sr.No.

Name of The Works

Client

Value(in Rs.)

Completion %

1.

Construction of Minor Bridges & RUBs (RCC Box structures) from Narayandoh to Ashti section (from chainage 15000 m to 67750 3) for Ahmednagar-Beed-Parli Vaijnath New BG line project.

Central Railway

132890617.64

 

2.

Part A- (i) BTBR - Proposed extension of DN shunting neck at NGP end by 450m - Earth work and extension to bridge No.810/1 & 810/2, existing 1 x 2.29 m & 1/3.05 m arch to be extended as 1 x 2.30 m RCC box respectively. (ii) BTBR - Proposed extension of UP shunting neck at WR end by 250 m - earth work & extension to bridge No.808/1 existing 1/4.57 m RCC box.
Part B- Rehabilitation of existing arch bridge No.788/2 of 1/4.57 m a Kms 788/19-21 bridge No.795/1,2/3.05 m arch at Kms 795/3-4, bridge No.804/22/4.57 m arch at Kms 804/8-9, bridge No.805/1,2/3.05 m arch at Kms 805/1-3 by inserting cast-in-situ RCC arch top box in existing opening and bridge No.791/2,1/6.10 m arch at Kms 791/7-8 by interning and jacketing section WR-NGP.

Central Railway

27102774.24

 

3.

(A) Rehabilitation of arch bridge Existing 1/6.10 m arch to be rebuilt by inserting cast-in-situ 1/5.30 m RCC arch top box in existing opening Bridge No.689/2 and 690/1 at Kms 689/26-28 and Kms 690/10-12 on Wardha-Badnera section.
(B)
Jacketing to abutments, pipers, wings and return walls of bridge No.743/1, 5/9.14 m girder at Kms 743/2-4 and bridge No.750/2, 4/9.14 m girder at Kms 750/10-12 on WR BD section.
(C)
Proposed repairs to cracked bed blocks of Bridge No.847/1, 15/30.48 m by Rock bolting under ADEN WRR on Majri-Rajur section.

Central Railway

21161131.80

 

4.

(1) Jacketing to abutments & pipers of Br.No.878/1, 2/12.20 m girder at Kms 878/3-5 on Itarsi Nagpur section and Jacketing to abutments of 6 Bridges Br.No.867/1 DN on Itarsi-Nagpur, Br.No.845/2 UP, 797/2 UP, 760/1 Chord line on Wardha-Ballarshah, 811/1 on Butibori-umrer & 896/1 on Amla-Chhindwara section and insertion of RCC Box in 9.14 m Existing span of Br.No.761/1 on Wardha-Ballarshah Chord line.
(2) Repairs to track on bridges-Increasing cess width and construction of toe walls at Br.No.878/1, Kms 878/3-5 on Amla-Nagpur section
(3) Rehabilitation of br.No.785/4, 2/9.14 m Girder at Kms 785/30-32 by Jacketing to Abutments, Pipers, Wings & Return, provision of drop wall, curtain wall, flooring etc on Wardha-Nagpur section.
(4) Repairs to existing arch Br.No.793/2, 2/3.05 m at Kms 793/23-25 interning and jacketing to Arch & Abutments provision of Drop / Curtain / Return wall and flooring on Wardha-Nagar section.

Central Railway

11135126.66

 

5.

(1) Jacketing to abutments & pipers of Br.No.878/1, 2/12.20 m girder at Kms 878/3-5 on Itarsi – Nagpur section and Jacketing to abutments of 6 Bridges Br.No.867/1 DN on Itarsi-Nagpur, Br.No.845/2 UP, 797/2 UP, 760/1 Chord line on Wardha-Ballarshah, 811/1 on Butibori-umrer & 896/1 on Amla-Chhindwara section and insertion of RCC Box in 9.14 m Existing span of Br.No.761/1 on Wardha-Ballarshah Chord line.
(2) Repairs to track on bridges-Increasing cess width and construction of toe walls at Br.No.878/1, Kms 878/3-5 on Amla-Nagpur section
(3) Rehabilitation of br.No.785/4, 2/9.14 m Girder at Kms 785/30-32 by Jacketing to Abutments, Pipers, Wings & Return, provision of drop wall, curtain wall, flooring etc on Wardha-Nagpur section.
(4) Repairs to existing arch Br.No.793/2, 2/3.05 m at Kms 793/23-25 interning and jacketing to Arch & Abutments provision of Drop / Curtain / Return wall and flooring on Wardha-Nagar section.

Central Railway

22118582.72

 

6.

Rehabilitation of existing arch bridges by interning & jacketing to Bridge No.766/1, 769/1, 795/2, 813/2, by arch top box to Bridge No.788/3 on Wardha – Nagpur section, Jacketing to wing walls at Bridge no.1020/1, Rehabilitation by interning & jacketing to Bridge No.985/1 on Itarsi – Nagpur section and Replacement of girder by RCC slab at Bridge No.821/1 on Butibori – Umrer Section.

Central Railway

13270035.08

 

7.

Rehabilitation of Bridge No.767/1, Existing 4/9.14 M girder at kms.767/24-26 by inserting RCC boxes of size 6.00 X 5.00 M in situ in existing openings of WR-NGP section.

Central Railway

11121301.10

 

8.

Aamby Valley City Contract No.12I002*H, Bridge Construction in North Lake Village, Aamby Valley City.

Sahara Infra.

52393892.00

 