H.H.Engineers

Specialized in earthwork, all types of bridges, tunnels, laying of tracks, building work and EPC contracts

 
 
  • EQUIPMENT
  • FEEDBACK
  • COMPLETED WORK
  • CURRENT PROJECT

 

Equipment

Sr.
No.

Description of
Machinery / Equipment

Size Capacity/HP
whichever
is applicable

Make/Model

Year of Purchase

Total No.of machinery/
Equipment available
with the tenderer

01

Excavators

1cum bucket

L&T CK72/90

2008

2

02

Loaders

1cum bucket

Escorts JCB 3D

2001

2

03

Miniloader

0.4cum bucket

IR-Bobcat

2002

1

04

Air Compressors

600 CFM

Atlas Copco

2006

2

05

Air Circulator fans with ducts

25HP

ROOTS

2002

2

06

Water Pumps

5HP

Kirloskar

2012

4

07

Water Pumps
(Pneumatic)

10HP

RHEPL

2011

1

08

Wagon Drill

100 mm-150mm

 

2011

1

09

Generators

20KVA

Powerman

2010-2013

3

10

Generators

125KVA

Cummins

2009

2

11

Tippers

10T

Ashok Leyland & TATA

2004-2010

8

12

Transit Mixer

6 cum

TATA

2009

4

13

Concrete Pump

20 cum/Hr

Schwing

2004

1

14

Bar Cutting & Bending Machine

32 mm Bar

Orient

2004

3 each

15

Structural Steel
Bending Machine

300 mm ISMC

Fabricated

2010

2

16

Batching Plant

20/25 cum/Hr

Deccan

2009

2

17

Slip form Shutter

Various Dia

Canstro

2008

3

18

Crusher

100/Tan/Hr

Singh, Nashik

2010

1

 

Feedback

 

Complete Work

Sr.No.

Name of The Work Completed

Client

Value(in Lakhs)

Date of Completion

1.

Linking of Track between km 114.5 - 129.2

Konkan Railway

159.730

24.05.1997

2.

Construction of Khandala Tunnel

MSRDC

691.650

27.09.1997 

3.

Construction of Kamshet II Tunnel

MSRDC

1203.560

08.04.2000

4.

Construction of Hydro Tunnel for Tata Power at Khopoli

Konkan Railway

164.000

22.05.2003

5.

Construction of two way bridge near TATA Dam at Lonavla

Sahara India
Commercial Com. Ltd

222.300

15.05.2004

6.

Construction of test track for Skybus Metro at Madgaon, Gao

Konkan Railway

245.710

31.07.2004

7.

Construction of Substructure of 19 x 18.30m span Viaduct Bridge between Ch:11449.20 M to Ch:11835.40M and earthwork in approaches in Pangri Usmanabad Section in connectuin with Latur-Kurduwadi Gauge Conversion Project.

Central Railway

656.907

30.05.2008

8.

Protection arrangement inside tunnel no.2 by providing steel portals at km 91/13-17, 92/5-6, 92/8-9 and 91/17-22 on PNVL-KJT section under ADEN (N)LNL

Central Railway

321.672

27.05.2010

9.

Construction of Balance Minor Bridge in Pandhapur - Miraj Section in connection with Miraj - Latur Gauge Conversion Project

Central Railway

684.449

20.06.2010

10.

Risk & Cost Works for Construction of Minor Bridges in Pandharpur - Miraj Section in Connection with Gauge Conversion of Latur- Miraj.

Central Railway

1975.413

30.11.2010

11.

Construction of Minor Bridges & RUBs (RCC Box structures) from Narayandoh to Ashti section (from chainage 15000 m to 67750 3) for Ahmednagar-Beed-Parli Vaijnath New BG line project.

Central Railway

13.289

26.09.2012

12.

Aamby Valley City Contract No.12I002*H, Bridge Construction in North Lake Village, Aamby Valley City.

Sahara Infra.

52393892.00

 

13.

Construction of 10 nos. L.H.S. by open cut method at unmanned LC in Gondia – Nagbhir section under the jurisdiction of ADEN/Nagbhir.

South East Central Railway.

16.822

30.11.2014

14.

Construction of 07 nos. L.H.S. by open cut method at unmanned LC in Nagbhir-Chandafort section under the jurisdiction of ADEN/Nagbhir.

South East Central Railway.

6.673

20.05.2014

15.

Elimination of 5 LC by constructing of LHS on Wani-Pimpalkhuti, Majri-Rajur, Tadali-Ghugus section,
(1) LC No. – 3C, (2) LC No. – 29C,(3) LC No. – 36C,
(4) LC No. – 2C, (5) LC No. -39B, by cut & cover method.

South East Central Railway.

6.673

20.05.2014

16.

Elimination of LC by constructing L.H.S. on Majr-Wani-Pimplkhuti section .
{A}(1)LC No.-14C,(2)LC No.-15,(3)LC No.-23,
{B}(1) LC No. – 33,(2) LC No. – 34, by cut & cover method.

Central Railway.

4.632

22.11.2015

17.

Construction of RCC box 4mx4m by cut & cover method for,
{A}(1)LC No.–5,(2)LC No.–26,(3)LC No.– 28,
{B} (1) LC No. – 9 (2) LC No. – 24.

Central Railway.

4.597

30.03.2016

 

Work In Hand

Sr.No.

Name of The Works

Client

Value(in Rs.)

Completion %

1.

Karjat - Lonavala : Streasthning of Br. No. 117/3 under ADEN .

Central Railway

2.316

 

2.

Protection of tunnel faces to prevent boulders falling and flattening of steep cutting in South East Ghat section.

Central Railway

3.94

 

3.

Construction of Minor & Major bridge work between Raimoha to Beed section from Chainage 160000m to 167500m for Ahmednagar – Beed – Parli vaijnath New Broad gauge Line Project.

Central Railway

13.26

 

4.

Balance works in relation to construction of L.H.S. at LC No. – GCF-67 at km. 1119/1-2 between Gondia – Nagbhir line under the jurisdiction of ADEN/Nagbhir

South East Central Railway

1.61

 

Powered by Sumeru Infosystem Pvt. Ltd.

Copyrights@2009, h.h.engineer

想要让胸部变大的一个重要的物理方法就是进行乳房按摩丰胸产品,经常用双手揉摸自己胸前的乳房,妈妈们可以发现这样可以显著地改善乳房的血液循环来增大乳房丰胸效果,并且把多余的脂肪排出。其次,女性成功瘦身而且丰胸的原理则在于木瓜酶的作用,一般来说,多吃木瓜丰胸方法,也有利于乳房的变大,因为木瓜酶能够促进乳腺发育,刺激女性的荷尔蒙,从而达到丰胸的目的产后丰胸